Search
  • ECHO Action Editor

Fitzwilliam Meeting with Ranger Solar


Fitzwilliam Town Hall Monday, March 20th, 7PM Update on the proposed 60-80 megawatt solar farm on hundreds of acres of land southeast of the intersection of Routes 12 and 119 between Scott Brook and the electrical right of way. Ranger Solar has said that the town has no input in the process. Bring your questions! http://www.sentinelsource.com/news/local/massive-solar-array-pitched-in-fitzwilliam/article_b988330a-dd80-5833-b9e4-9538cb9042ba.html

Facebook event page


0 comments

Recent Posts

See All

Powering Our Production with The Sun

Bring on the sun! Our new 136-kilowatt photovoltaic array is expected to produce 40 percent of the electricity needed at our building systems manufacturing facility. Solar-Powered Manufacturing Benson

© 2020 ECHO Action: #FossilFree603

ECHOaction.org  •  FossilFree603.org • PipelineFree603.org

  • Facebook
  • Twitter
  • YouTube
  • Pinterest
  • Google+
  • LinkedIn
  • Instagram
  • Email